Contact Us
Plaza By The Park
Year:
2010
Category:
Existing Non-Residential Building
Rating:
Green Mark Award for Buildings – Gold
Features:
- Estimated energy savings: 1,441,820 kWh/yr; Estimated water savings: 7,600 m3/yr.
- Air-conditioning plant system effi ciency: 0.65 kW/ton
- The chiller system is fitted with Auto Condenser Tube Cleaning System and Variable Speed Drives for all pumps and cooling towers.
- AHUs are fitted with Variable Speed Drives, DDC controllers and CO2 sensors with modulating valve to respond accordingly to load condition.
- Pre-cool AHUs are installed with heat pipes to provide better humidity control by reducing moisture in the air.
About G-Energy
Commercial Projects
Healthcare Projects
Hotel Projects
Industrial Projects
Office Projects
Energy Services
Energy Audit
Energy Consultancy
Remote Monitoring Service
EEOA
AHU Fan Replacement
ESD Services
Green Mark Consultancy
LEED Consultancy
Total Building Performance
Simulation Services
Solar & Sun Path Analysis
Daylight & Glare Analysis
Energy Modeling
CFD Analysis
BIM Services
©2005-2023, G-Energy Global Pte Ltd, All Rights Reserved.